Free tool · runs in your browser
Rolled Throughput Yield Calculator
Type each step with units in and good-first-time units to get first-pass yield, rolled throughput yield and the worst step, plus a free Excel template.
Start here · Scoping Sprint
Know the exact price in 2 working days. $99, credited in full to your build.
Builds from $75, fixed in writing · Working draft in 5 days or your first payment back · Mutual NDA first if you want one
See a sample Sprint report →Who you'll work with: two partners, 10+ years on finance workbooks →
Each step on a line can look healthy on its own and the line can still lose one unit in eight. Type your steps in order, with the units that went in and the units that came out good first time, and the calculator multiplies the first-pass yields into your rolled throughput yield and points to the step losing the most. Nothing leaves your browser.
Your process steps, in order
- 1First-pass yield97.0%
- 2First-pass yield96.0%
- 3First-pass yield97.0%
- 4First-pass yield97.0%
First-pass yield = units that came out good first time ÷ units that went in. Reworked units don't count as good first time. Rolled throughput yield multiplies every step's first-pass yield. The sample data is made up: type your own steps over it.
Rolled throughput yield
87.6%
Hidden factory: 12.4% of units need rework or are scrapped somewhere
Good first time, end to end: 876 of 1,000 started
Worst step: Welding at 96.0%
Paste into Excel
With steps in A, units in in B and good first time in C (headers in row 1). Excel 365 or 2021 and later.
Runs entirely in your browser. Nothing is sent anywhere unless you choose to WhatsApp us the result.
How it works
Why 97% at every step isn't 97% for the line.
First-pass yield for a step is good-first-time units divided by units in. Rolled throughput yield multiplies those yields together, because a unit has to pass every step to come out good. In the sample, four steps between 96% and 97% give an RTY of 87.6%: about 124 of every 1,000 units started need rework or are scrapped somewhere along the line.
That gap is often called the hidden factory: work that happens, costs labour and material, and never shows up in a final pass rate, because reworked units ship in the end. Tracking RTY by line and by week shows where that capacity is going, and the worst step tells you where to look first.
The free Excel template has the same formulas for up to eight steps, a share-of-losses column, and the worst step picked out for you. Replace the sample rows with your own.
Excel for manufacturing
Production, yield and cost reports built from your shift logs and ERP exports, refreshed in one click.
See the approachMore free Excel templates
Budget vs actual, month-end close, an oil and gas production tracker and more, each with working formulas and sample data.
Browse the templatesWant RTY by line, every week?
We build yield and scrap reports from the data you already log.
Start with a Scoping Sprint: a written diagnosis of your current workbook, a fixed-price proposal and a clear definition of done.
Self-serve
Direct channels
Score it, then
fix it.
- Price in writing
- Fixed
- Working draft
- 5 days
- Reply
- 1 day
- 1Book the Scoping Sprint
- 2Approve a fixed price
- 3Working draft in 5 days
Frequently asked
Questions people ask most.
What is rolled throughput yield?
Rolled throughput yield (RTY) is the share of units that pass through every step of a process good the first time, with no rework and no scrap. It is the first-pass yields of all the steps multiplied together.
How do I calculate rolled throughput yield in Excel?
Put each step in a row with units in (column B) and units good first time (column C). First-pass yield for a step is =C2/B2. RTY for steps in rows 2 to 5 is =PRODUCT(C2:C5/B2:B5) in Excel 365 or 2021 and later, or multiply the first-pass yield cells together in older versions.
What is the difference between first-pass yield and rolled throughput yield?
First-pass yield describes one step. Rolled throughput yield describes the whole line: because it multiplies every step, four steps at about 97% each give an RTY of about 88%, which is lower than any single step suggests.
Do reworked units count as good?
Not for first-pass yield or RTY. A unit that needed rework at a step counts as a loss at that step, even if it was shipped in the end. That hidden rework is what RTY is designed to show.
Is the calculator free?
Yes. It runs in your browser, with no form or sign-up, and the Excel template is a free download with the same formulas.